Landed house – Kitchen renovation package

Kitchen package

$12888

Package Includes

  • check
    Supply labour & equipment to hack wall & floor tiles.
  • check
    Supply labour & equipment to hack existing kitchen cabinet.
  • check
    Supply labour & materials to lay full height wall tiles (maximum 600 sqft).
  • check
    Supply labour & materials to lay floor tiles (maximum 350 sqft)
  • check
    Supply labour & materials to construct kitchen cabinet base.
  • check
    Supply labour & materials to construct fridge base.
  • check
    Design & fabricate 30 ft kitchen cabinet.
  • check
    Design & fabricate 15 ft imported granite work top.
  • check
    Supply labour & materials to run concealed cold water pipes to kitchen sink.
  • check
    Supply labour & materials to rewire kitchen using back existing points (concealed wirings).
  • check
    Supply labour & materials to paint ceilings of kitchen.
  • check
    Haulage service, supply of sand & clearing of debris.
  • check
    Supply labour & materials to chemical wash whole area after completion of renovation.
  • check
    Interior design and space planning.
  • check
    Floor plan layout.
  • check
    Site co-ordination and supervision.
  • check
    Materials and color proposal cum selection.

Not the right package

Send in a custom quote now

Get an instant quote

Try instant calculator to get an estimated quote

Want to find out what are the six factors that could affect your cost of renovation? You can check out our comprehensive lists of renovation packages here? For those with units below 3000 sqft, check out our condo and landed package. And if you need renovation for bathrooms as well as kitchen, we have a package just for that. Go to landed house kitchen and bathroom package

5/5 (1 Review)