First Floor
Demolition And Masonry Works
- Supply labour & equipment to hack/demolish/dismantle the following:
- Patio floor tiles
- Living floor tiles
- Dining floor tiles
- Car porch floor tiles
- WC 1 floor and wall tiles
- WC 2 floor and wall tiles
- Kitchen floor and wall tiles
- Supply labour & materials to lay 800 x 800mm floor tiles for:
- Living hall
- Dining hall
- Patio
- Supply labour & materials to lay 300 x 600 mm floor tiles for:
- WC 1
- WC 2
- Supply labour & materials to lay 300 x 600 mm wall tiles for:
- Kitchen
- WC 1
- WC 2
- Supply labour & materials to construct 50 mm mortar base for:
- Fridge
- Washing Machine
- Kitchen Cabinet
- Carpentry
Works
- Design & fabricate 30 ft top & bottom kitchen cabinet
- Design & fabricate 8 ft designer’s feature wall
- Design & fabricate 8 ft suspended TV console
- Design & fabricate 3ft suspended vanity cabinet for WC 1
- Design & fabricate 5ft full height shoe cabinet
- Design & fabricate 22 ft solid surface work top for kitchen cabinet and vanity cabinet.
Ceiling Works
- Supply labour & materials to construct false ceiling (max 300 sqft)
- Supply labour & materials to construct curve light holder (max 60 sqft)
- Supply labour & materials to construct 18″ L-Box (max 80 ft)
- Supply labour & materials to paint all interior walls & ceiling using Nippon 5000 paint.
- Supply labour & materials to paint all sewage pipes, doors & door frames
Plumbing Works
- Supply labour only to install the following items:
- Two units toilet bowls
- Two units wash basin
- One unit kitchen sink
- Two units shower sets
- Two units bidet spray
- One unit storage heater
- Two units bathroom accessories
- Supply labour & materials to run new conceal cold & hot water pipes for kitchen, WC 1 & WC 2
- Supply labour & materials to run new conceal cold & hot water pipes for kitchen, WC 1 & WC 2
- Four single sockets
- One SCV point
- One telephone point
- One cooker hood point
- One heater point
- One oven point
- Twenty eight lighting points
- Twenty eight linstalled lights
- One air-con point
Door Works
- Supply labour & materials to install new solid veneer main door and rear entrance door
- Supply labour & materials to install 2 sets of sand blasted glass door for both WC
- Supply labour & materials to install 1 set of solid veneer door for utility room
Miscellaneous Works
- Haulage service, supply of sand & clearing of debris for 1st floor
- Supply labour & materials to chemical wash 1st floor
Second Floor
Demolition And Masonry Works
- Supply labour & materials to hack/demolish/dismantle:
- Lobby floor tiles
- Master bathroom floor and wall tiles
- Bathroom 2 floor and wall tiles
- Balcony floor tiles
- Master bedroom flooring
- Bedroom 2 flooring
- Supply labour & materials to lay 800 x 800 mm floor tiles for lobby
- Supply labour & materials to lay 300 x 300 mm floor tiles for both master bathroom and bathroom 2.
- Supply labour & materials to lay 300 x 600 mm wall tiles for both master bathroom and bathroom 2.
- Supply labour & materials to cement screed floors for master bedroom, bedroom 2 and balcony.
- Supply labour & materials to install parquet flooring for master bedroom and bedroom 2
- Supply labour & materials to install changrai flooring for balcony flooring.
Carpentry Works:
- Design & fabricate 10 ft full height sliding door wardrobe for master bedroom
- Design & fabricate 6 ft designer feature wall with suspended TV console for master bedroom
- Design & fabricate 4 ft suspended vanity cabinet c/w solid surface top for master bathroom.
- Design & fabricate 6 ft full height sliding door wardrobe for bedroom 2
- Design & fabricate 6 ft designer feature wall c/w suspended TV console for bedroom 2
- Design & fabricate 3ft suspended vanity cabinet c/w solid top for bathroom 2
Ceiling Works:
- Supply labour & materials to construct false ceiling up to 200 sqft
- Supply labour & materials to construct curve light holder up to 60 ft
- Supply labour & materials to construct 18″ L-Box up to 80 ft
- Supply labour & materials to paint all interior walls & ceiling using Nippon 5000 paint.
- Supply labour & materials to paint all sewage pipes, doors & door frames
Plumbing Works:
- Supply labour & materials to run new conceal cold & hot water pipes for master bathroom and bathroom 2
- Supply labour only to install the following items
- 2 units wash basin
- 2 units toilet bowls
- 2 units shower set
- 2 units Bidet spray
- 2 units bathroom accessories
- 1 unit storage heater
Electrical Works:
- Supply labour & materials to re-wire 2nd floor using running concealed wiring for
- 8 double sockets
- 2 single sockets
- 2 SCV
- 2 Telephone point
- 2 Heater point
- 25 lighting points
- 25 installed lights
- 1 air-con point
Miscellaneous Works:
- Haulage service, supply of sand & clearing of debris for 2nd floor.
- Supply labour & materials to chemical wash 2nd floor after renovating works.
- Supply labour & materials to install 2 sets of tempered glass shower screen for both bathrooms.
- Supply labour & materials to install 2 sets of solid veneer doors for both bedrooms.
- Supply labour & materials to install 2 sets of sand blasted glass door for bathroom entrance.
Third floor
Demolition And Masonry Works
- Supply labour & materials to hack/demolish/dismantle:
- Family area floor tiles
- Bathroom wall and floor tiles
- Balcony floor tiles
- Bedroom 3 flooring
- Bedroom 4 flooring
- Supply labour & materials to lay 800 x 800 mm floor tiles for family area.
- Supply labour & materials to lay 300 x 300 mm floor tiles for bathroom.
- Supply labour & materials to lay 300 x 600 mm wall tiles for bathroom.
- Supply labour & materials to cement screed bedrooms 3, 4 and balcony area.
- Supply labour & materials to install parquet flooring for bedrooms 3 & 4.
- Supply labour & materials to install changrai wooden flooring for balcony floor.
Carpentry Works:
- Design & fabricate 7 ft full height sliding door wardrobe for bedroom 3.
- Design & fabricate 8 ft full height sliding door wardrobe for bedroom 4.
- Design & fabricate 6 ft designer feature wall c/w suspended TV console for bedrooms 3 & 4.
- Design & fabricate 3ft suspended vanity cabinet c/w solid top for both bathrooms.
Ceiling works:
- Supply labour & materials to construct false ceiling up to 150 sqft.
- Supply labour & materials to construct curve light holder up to 60 ft.
- Supply labour & materials to paint all interior walls & ceiling using Nippon 5000 paint.
- Supply labour & materials to paint all sewage pipes, doors & door frames.
Plumbing works:
- Supply labour & materials to run new conceal cold & hot water pipes for bathroom.
- Supply labour only to install the following items:
- 1 unit toilet bowl
- 1 unit wash basin
- 1 unit shower set
- 1 unit bidet spray
- 1 unit storage heater
- 1 set bathroom accessories
Electrical works:
- Supply labour & materials to re-wire 3rd floor using running concealed wiring for:
- 8 double sockets
- 2 single sockets
- 2 SCV point
- 2 Telephone point
- 1 Heater point
- 20 Lighting points
- 20 Install lights
- 1 Air-con point
Miscellaneous works:
- Haulage service, supply of sand & clearing of debris for 3rd floor
- Supply labour & materials to chemical wash 3rd floor after renovation works..
- Supply labour & materials to install 1 set of tempered glass shower screen for bathroom.
- Supply labour & materials to install 2 sets of solid veneer doors for both bedrooms..
- Supply labour & materials to install 1 set of sand blasted glass door for bathroom
Roof Garden
Demolition And Masonry Works
- Supply labour & materials to hack/demolish/dismantle existing roof deck flooring.
- Supply labour & materials to cement screed roof deck flooring.
- Supply labour & materials to lay changrai wooden flooring for roof deck.
Plumbing And Electrical Works
- Supply labour & materials to run cold water concealed pipe for spray pipe & hand wash point.
- Supply labour & materials to run concealed wiring for 2 double sockets and 2 lighting points.
Main miscellaneous works:
- Supply labour & materials scaffolding and painting of exterior facade.
- Supply labour & materials to lay water proofing for all wet areas flooring.
- Supply labour & materials to inject water proofing membrane to all exterior walls.
- Supply labour & hack whole house stairways flooring & lay parquet flooring.
- Supply labour & materials to chemical wash exterior of the entire house.